AAF 11/3 1100°C, 3 litre 301 single ramp PID controller Ashing & Burnoff Chamber
La imagen es solo una referencia, puede diferir e incluir accesorios no disponibles en el producto.
Ashing & Burnoff Chamber Furnace (220 - 240 V -SR-single phase + N)
The picture shows an item from the same kind.
Size and outfit could be different to that type.
PID-Controller
one ramp to setpoint
99 hour process timer which can be programmed for a timed delay at the start of the process or used as a countdown timer.
Optional
Upgrade from 301 to CC-T1 touchscreen (00050670)
Over-temperature protection digital (OPTOTCF)
+ info The picture shows an item from the same kind.
Size and outfit could be different to that type.
PID-Controller
one ramp to setpoint
99 hour process timer which can be programmed for a timed delay at the start of the process or used as a countdown timer.
Optional
Upgrade from 301 to CC-T1 touchscreen (00050670)
Over-temperature protection digital (OPTOTCF)
-
- Fabricante: Carbolite-Gero
- Artículo-núm.: CAAF1133010000000
- Validez: 31.03.2023
- Última actualización: 14.11.2022